diff options
| author | Joel Challis | 2025-05-26 13:04:52 +0200 |
|---|---|---|
| committer | GitHub | 2025-05-26 13:04:52 +0200 |
| commit | 3703699757b6ce938ff412aca0a8b064927c0cdb (patch) | |
| tree | 2b264de0e7a724c30cca511a9bac7ad29705d1a2 /docs/breaking_changes.md | |
| parent | c97a798af76f6717d56d7279d418f49a96730e4f (diff) | |
2025 Q2 changelog (#25297)
Co-authored-by: Drashna Jaelre <drashna@live.com>
Co-authored-by: Nick Brassel <nick@tzarc.org>
Diffstat (limited to 'docs/breaking_changes.md')
| -rw-r--r-- | docs/breaking_changes.md | 20 |
1 files changed, 10 insertions, 10 deletions
diff --git a/docs/breaking_changes.md b/docs/breaking_changes.md index a5a57ccd12..9063fc18db 100644 --- a/docs/breaking_changes.md +++ b/docs/breaking_changes.md @@ -10,25 +10,25 @@ Practically, this means QMK merges the `develop` branch into the `master` branch ## What has been included in past Breaking Changes? +* [2025 May 25](ChangeLog/20250525) * [2025 Feb 23](ChangeLog/20250223) * [2024 Nov 24](ChangeLog/20241124) -* [2024 Aug 25](ChangeLog/20240825) * [Older Breaking Changes](breaking_changes_history) ## When is the next Breaking Change? -The next Breaking Change is scheduled for May 25, 2025. +The next Breaking Change is scheduled for Aug 31, 2025. ### Important Dates -* 2025 Feb 23 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions. -* 2025 Apr 27 - `develop` closed to new PRs. -* 2025 Apr 27 - Call for testers. -* 2025 May 11 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes -* 2025 May 18 - `develop` is locked, only critical bugfix PRs merged. -* 2025 May 23 - `master` is locked, no PRs merged. -* 2025 May 25 - Merge `develop` to `master`. -* 2025 May 25 - `master` is unlocked. PRs can be merged again. +* 2025 May 25 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions. +* 2025 Aug 3 - `develop` closed to new PRs. +* 2025 Aug 3 - Call for testers. +* 2025 Aug 17 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes +* 2025 Aug 24 - `develop` is locked, only critical bugfix PRs merged. +* 2025 Aug 29 - `master` is locked, no PRs merged. +* 2025 Aug 31 - Merge `develop` to `master`. +* 2025 Aug 31 - `master` is unlocked. PRs can be merged again. ## What changes will be included? |