aboutsummaryrefslogtreecommitdiffstats
path: root/docs/breaking_changes.md
diff options
context:
space:
mode:
authorNick Brassel2025-05-26 13:41:49 +0200
committerNick Brassel2025-05-26 13:41:49 +0200
commit75a037d2f0f9c54bad8e2f68ae82134559c92f22 (patch)
tree2b264de0e7a724c30cca511a9bac7ad29705d1a2 /docs/breaking_changes.md
parent28720c4d343a9c5e9f5a62dbd583dbf536a2e61e (diff)
parent3703699757b6ce938ff412aca0a8b064927c0cdb (diff)
Merge remote-tracking branch 'upstream/develop'
Diffstat (limited to 'docs/breaking_changes.md')
-rw-r--r--docs/breaking_changes.md20
1 files changed, 10 insertions, 10 deletions
diff --git a/docs/breaking_changes.md b/docs/breaking_changes.md
index a5a57ccd12..9063fc18db 100644
--- a/docs/breaking_changes.md
+++ b/docs/breaking_changes.md
@@ -10,25 +10,25 @@ Practically, this means QMK merges the `develop` branch into the `master` branch
## What has been included in past Breaking Changes?
+* [2025 May 25](ChangeLog/20250525)
* [2025 Feb 23](ChangeLog/20250223)
* [2024 Nov 24](ChangeLog/20241124)
-* [2024 Aug 25](ChangeLog/20240825)
* [Older Breaking Changes](breaking_changes_history)
## When is the next Breaking Change?
-The next Breaking Change is scheduled for May 25, 2025.
+The next Breaking Change is scheduled for Aug 31, 2025.
### Important Dates
-* 2025 Feb 23 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions.
-* 2025 Apr 27 - `develop` closed to new PRs.
-* 2025 Apr 27 - Call for testers.
-* 2025 May 11 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes
-* 2025 May 18 - `develop` is locked, only critical bugfix PRs merged.
-* 2025 May 23 - `master` is locked, no PRs merged.
-* 2025 May 25 - Merge `develop` to `master`.
-* 2025 May 25 - `master` is unlocked. PRs can be merged again.
+* 2025 May 25 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions.
+* 2025 Aug 3 - `develop` closed to new PRs.
+* 2025 Aug 3 - Call for testers.
+* 2025 Aug 17 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes
+* 2025 Aug 24 - `develop` is locked, only critical bugfix PRs merged.
+* 2025 Aug 29 - `master` is locked, no PRs merged.
+* 2025 Aug 31 - Merge `develop` to `master`.
+* 2025 Aug 31 - `master` is unlocked. PRs can be merged again.
## What changes will be included?